Question: Problem 1. The Strike (i.e., The Structural Contour) And Dip For Plane B Is Shown At The 710 M Elevation. We Want To Intersect The Two Planes A & B At The 710 M Elevation. We Need The Structural Contour For Plane A At 710m. 160 Structure Contour 710 Structure Contour 50 700 Boulder Creek Contours 50 100m 11. What Is The Approximate Depth To The Line …

Question: Problem 1. The Strike (i.e., The Structural Contour) And Dip For Plane B Is Shown At The 710 M Elevation. We Want To Intersect The Two Planes A & B At The 710 M Elevation. We Need The Structural Contour For Plane A At 710m. 160 Structure Contour 710 Structure Contour 50 700 Boulder Creek Contours 50 100m 11. What Is The Approximate Depth To The Line …

Problem 1. The strike (i.e., the structural contour) and dip for Plane B is shown at the 710 m elevation. We want to intersec

Show transcribed image text

Transcribed Image Text from this Question

Problem 1. The strike (i.e., the structural contour) and dip for Plane B is shown at the 710 m elevation. We want to intersect the two planes A & B at the 710 m elevation. We need the structural contour for Plane A at 710m. 160 structure contour 710 structure contour 50 700 Boulder Creek contours 50 100m 11. What is the approximate depth to the line of intersection of Plane A and Plane B (i.e., the vein) at Boulder Creek? 82 m b. 17 m c. 24 m d. 1 m a. e 30 m 12. What is the attitude (trend, plunge) of the line of intersection? a. 180, 10 b. 060, 48 c. 120, 76 d. 212, 33 e. 270, 40 13. What is the pitch of the intersection line in plane B? a. 21NW b. 55SE c. 435W d. 15NE e. 12N